Electrical Contract Template
A free electrical contract template for service upgrades, rewires, panel changes, and fixture work: licensed scope, permits and inspections, power interruption, load calculations, emergency rates, and warranty on labor versus devices. Download in PDF or Word.
Last updated: August 5, 2026
What Is a Electrical Contract?
An electrical contract is the written agreement between a property owner and a licensed electrical contractor for wiring, service, panel, device, or fixture work in a building. Electrical work is governed by an adopted electrical code and by state licensing law, so the contract carries requirements that a general services agreement does not: a licensed electrician must perform or supervise the work, the utility often has to be coordinated with, permits are usually mandatory, and the rough wiring generally must be inspected before it is covered.
The contract also has to deal with what existing buildings hide. Older houses turn up ungrounded two-wire circuits, aluminum branch wiring, undersized services, federal-era panels that inspectors will not pass, missing arc-fault or ground-fault protection, and junction boxes buried in walls. Any of those can convert a straightforward job into a code-required upgrade, so the document needs a concealed-conditions rule, a written change order step, and clear language on which corrections are included and which are extra.
When to Use This Template
- ✓You are hiring a licensed electrician for a panel change, service upgrade, rewire, or circuit additions
- ✓The job requires permits, a rough inspection, and utility coordination for a service disconnect
- ✓Power will be interrupted and the building or specific circuits will be out of service
- ✓The building is older and code-required upgrades such as grounding or AFCI and GFCI protection may be triggered
- ✓You are adding load — EV charging, a hot tub, a range, a heat pump — and a load calculation is needed
- ✓You want documented rates for diagnostics, after-hours calls, and warranty on labor versus devices
Received a contract like this to sign?
Don't guess what's in it. ScanContract's AI flags risky clauses in 60 seconds.
Analyze My Contract FreeTemplate Preview
Full text of the template. Fields in [BRACKETS] are placeholders you fill in.
Electrical Contract
1. 1. Parties and Service Location
This Electrical Services Contract (the "Contract") is entered into on [EFFECTIVE DATE] between [OWNER NAME], located at [OWNER ADDRESS] (the "Owner"), and [ELECTRICAL CONTRACTOR NAME], a [ENTITY TYPE] holding electrical contractor license number [LICENSE NUMBER] issued by [LICENSING AUTHORITY] and located at [CONTRACTOR ADDRESS] (the "Contractor"). The work will be performed at [SERVICE ADDRESS] (the "Property"). All work will be performed by or under the direct supervision of a licensed electrician as required by applicable law. The Owner represents that it owns the Property or is authorized to have the work performed and will identify any tenant, property manager, or association whose consent or notice is required.
2. 2. Scope of Electrical Work
The Contractor will furnish the labor, materials, devices, and equipment to perform the following: [ELECTRICAL SCOPE, e.g., replace the existing 100-amp main panel with a 200-amp service including new meter socket, service entrance conductors, mast or lateral connection, grounding electrode system, bonding, and labeled circuit directory; or install a dedicated 50-amp circuit and receptacle for an EV charger; or rewire the second floor including new devices, boxes, and fixtures]. Included are [INCLUDED ITEMS, e.g., permits, utility coordination, code-required grounding and bonding upgrades, arc-fault and ground-fault protection on affected circuits, load calculation, and labeling]. Excluded are: [EXCLUSIONS, e.g., drywall repair and painting, trenching and concrete restoration, low-voltage and data cabling, alarm and fire systems, appliance and equipment supplied by others, generator or solar interconnection, and correction of unrelated existing violations]. Fixtures or devices supplied by the Owner are installed at the risk of the Owner and are excluded from the warranty of the Contractor.
3. 3. Load Calculation and Capacity
Where the Work adds load or alters the service, the Contractor will perform a load calculation in accordance with the applicable electrical code and will confirm that the existing or proposed service, panel, feeders, and branch circuits are adequate. The Owner will disclose all existing and planned loads, including [LOAD DISCLOSURE ITEMS, e.g., electric range, dryer, water heater, heat pump or electric heat, hot tub, pool equipment, well pump, workshop equipment, EV chargers, and battery or generator systems]. If the calculation shows the existing service is inadequate for the requested Work, the Contractor will present the options and pricing — including a service upgrade, a load management device, or a reduced scope — and will proceed only on written direction from the Owner. Panel space, breaker compatibility, and the availability of listed breakers for an older panel are confirmed before ordering; obsolete or unsafe panels that a manufacturer no longer supports may require replacement rather than modification.
4. 4. Pricing, Rates, and Emergency Service
The Contract Price for the scope in Section 2 is [CONTRACT PRICE], quoted as [FLAT RATE / TIME AND MATERIALS]. Time and materials work is billed at [REGULAR HOURLY RATE] per hour per electrician during regular hours of [REGULAR HOURS] on [REGULAR DAYS], with a minimum charge of [MINIMUM CHARGE] and billing in [BILLING INCREMENT] increments after the first hour. Troubleshooting a fault of unknown origin is billed at [TROUBLESHOOTING RATE] and includes up to [TROUBLESHOOTING DURATION] of diagnosis, after which the Contractor will present a written repair estimate for approval. After-hours, weekend, and holiday work is billed at [AFTER-HOURS RATE] plus an emergency dispatch charge of [EMERGENCY TRIP CHARGE]. Materials, devices, and fixtures are billed at [MATERIAL PRICING, e.g., cost plus [MARKUP PERCENTAGE]]. Permit, inspection, and utility fees are [INCLUDED IN / IN ADDITION TO] the price and passed through at cost.
5. 5. Permits, Code Compliance, and Inspections
The Contractor will obtain the electrical permit required for the Work and will schedule and attend all required inspections, including the rough inspection that must occur before walls are closed and the final inspection required before the utility will reconnect an upgraded service. Permit and inspection fees are [INCLUDED IN / IN ADDITION TO] the Contract Price. The Work will comply with the electrical code adopted at the Property, including requirements for conductor sizing and protection, grounding and bonding, arc-fault and ground-fault protection, tamper-resistant receptacles, working clearance at panels, box fill, support and securing of cables, and labeling. The Owner acknowledges that inspectors commonly require correction of existing conditions in the area of the Work — such as missing grounds, open splices, unsupported cables, buried junction boxes, double-tapped breakers, or missing panel labeling — and that those corrections will be added by written change order. The Contractor will not conceal work that has not passed inspection or energize a circuit that does not comply with the code.
6. 6. Payment Terms
Payment is due as follows: [DEPOSIT AMOUNT] on signing or at material and equipment order, [PROGRESS PAYMENT] on completion of rough-in and passing the rough inspection, and the balance on completion, final inspection, and restoration of service. Service and repair calls are payable on completion of the visit. Payment is made by [PAYMENT METHOD]. Amounts unpaid after [LATE TRIGGER, e.g., 10 days] accrue interest at [LATE FEE PERCENTAGE] per month or the maximum rate permitted by applicable law, whichever is less, and the Owner is responsible for reasonable collection costs and attorney fees. The Contractor may suspend the Work for nonpayment after written notice, except that it will not leave the Property in an unsafe or de-energized condition and will make the installation safe before suspending. Returned payments are subject to a fee of [RETURNED PAYMENT FEE].
7. 7. Power Interruption, Utility Coordination, and Access
The Owner acknowledges that electrical service to all or part of the Property will be interrupted during the Work. The Contractor will give at least [OUTAGE NOTICE, e.g., 48 hours] notice of a planned outage for scheduled work and will coordinate with [UTILITY NAME] for any required disconnect and reconnect; the Contractor is not responsible for delay caused by the schedule of the utility or of the inspection authority. The estimated duration of the main outage is [OUTAGE DURATION]. The Owner is responsible for protecting temperature-sensitive contents, medical equipment, servers, aquariums, and sump pumps, and for arranging temporary power or alternative accommodation if needed; the Contractor is not liable for spoiled food, lost data, business interruption, or similar losses caused by a planned or code-required outage. The Owner will provide clear access to the panel, meter, attic, crawl space, and any area containing the affected wiring, and will clear stored items from the required working clearance at the panel.
8. 8. Concealed Conditions and Existing Wiring
The Contract Price assumes the wiring methods and conditions visible or reasonably inferable at the time of the estimate. If the Contractor encounters a concealed condition materially different from what was expected — including knob-and-tube wiring, aluminum branch circuit conductors, ungrounded two-wire circuits, undersized or damaged conductors, deteriorated insulation, unlisted or recalled panels and breakers, buried or inaccessible junction boxes, unpermitted prior work, or framing and insulation conditions that prevent fishing new cable — the Contractor will stop work in the affected area, notify the Owner, and price the additional work as a change order. The Contractor is not responsible for the failure of existing devices, fixtures, or conductors that fail when a circuit is de-energized and re-energized or when aged terminations are disturbed, and will report visibly hazardous conditions observed during the Work whether or not they are within the scope.
9. 9. Access Openings, Restoration, and Cleanup
Where the Work requires opening walls or ceilings, the Contractor will make openings no larger than reasonably necessary and will [RESTORATION LEVEL, e.g., leave openings unrepaired / patch drywall to an unfinished, untaped condition]. Finish restoration, including drywall finishing, texture, paint, wallpaper, tile, trim, insulation replacement, and exterior siding or stucco patching, is excluded unless listed in Section 2. Trenching for underground feeders includes backfill and rough grade only; concrete, asphalt, pavers, and landscaping restoration are excluded unless quoted. The Contractor will protect finished floors and surfaces along its work path, contain dust from cutting where practical, remove all removed devices, wire, packaging, and debris, and leave the work area broom clean. Removed panels, fixtures, and equipment will be disposed of or recycled lawfully.
10. 10. Licensing, Insurance, and Safety
The Contractor holds the electrical license identified in Section 1 and will keep it and any required bond in force for the duration of the Work. The Contractor will maintain commercial general liability insurance of at least [GENERAL LIABILITY LIMIT, e.g., $1,000,000 per occurrence and $2,000,000 aggregate], automobile liability, and workers compensation coverage at statutory limits for its employees, and will require comparable coverage of any subcontractor. Certificates will be provided on request and, where required, will name the Owner as an additional insured. The Contractor is responsible for the safety of its own means and methods, including lockout and tagout, personal protective equipment, arc flash precautions, and verification that circuits are de-energized before work begins. The Owner will keep occupants, children, and pets away from open panels, exposed conductors, and work areas, and will not operate any circuit the Contractor has tagged out.
11. 11. Warranty on Labor and Devices
The Contractor warrants its workmanship for [LABOR WARRANTY PERIOD, e.g., one year] from the date of completion and will return to correct defective installation at no charge during that period. Devices, panels, breakers, fixtures, and equipment carry only the warranty of their manufacturer, which is passed through to the Owner; after the workmanship period, the Owner is responsible for the labor to replace a part covered by a manufacturer warranty. Lamps, ballasts, drivers, and consumables are warranted only by their manufacturer. The warranty excludes damage from power surges, lightning, utility voltage events, water intrusion, rodents, overloading, misuse, alterations or repairs by others, owner-supplied fixtures and equipment, and acts of nature. Warranty service is provided during regular hours; after-hours warranty calls are billed at the applicable trip charge. The Contractor will deliver the permit sign-off, the labeled circuit directory, and any manufacturer documentation at completion.
12. 12. Liability and Limitations
The Contractor will exercise reasonable care and will test its installation, including continuity, polarity, and ground-fault and arc-fault function, before completion. The Contractor is responsible for damage caused by its own defective workmanship, subject to the limitations in this section. The Contractor is not responsible for pre-existing violations outside the scope, for the condition or performance of equipment supplied by others, for damage caused by utility voltage irregularities or surges, or for consequential losses including lost data, spoiled goods, lost rent, business interruption, or alternative accommodation. The total liability of the Contractor under this Contract will not exceed the greater of the Contract Price or the limits of the liability insurance required in Section 10, except for claims arising from bodily injury or willful misconduct. The Owner will notify the Contractor promptly of any suspected defect so it can be inspected before other work covers it.
13. 13. Termination, Cancellation, and Dispute Resolution
Either Party may terminate this Contract for a material breach not cured within [CURE PERIOD, e.g., 5 days] after written notice, provided that the Contractor will leave the electrical system in a safe and code-compliant condition. The Owner may cancel scheduled non-emergency work with at least [CANCELLATION NOTICE, e.g., 24 hours] notice; later cancellations may incur a fee of [CANCELLATION FEE], and special-order equipment such as panels, switchgear, and custom fixtures is non-refundable once ordered. If this Contract was signed at the Property or away from the permanent place of business of the Contractor, the Owner may have the right to cancel within three business days under federal and state home solicitation sales law, subject to any exception for emergency repairs requested in writing. This Contract is governed by the laws of the State of [GOVERNING STATE], and disputes will be mediated in [MEDIATION LOCATION] before any proceeding in the courts of [VENUE COUNTY AND STATE], with the prevailing Party entitled to reasonable attorney fees.
14. 14. Signatures
By signing below, both Parties confirm they have read this Contract, understand it, and agree to be bound as of the Effective Date. OWNER: [OWNER NAME]. Signature: ______________________. Printed Name: [OWNER SIGNER NAME]. Date: [DATE]. CONTRACTOR: [ELECTRICAL CONTRACTOR NAME]. Signature: ______________________. Printed Name: [CONTRACTOR SIGNER NAME]. Title: [TITLE]. License Number: [LICENSE NUMBER]. Date: [DATE]. This Contract may be executed in counterparts, and electronic signatures have the same effect as original signatures.
15. Disclaimer
This template is provided for general informational purposes only and is not legal advice. Electrical work is a licensed trade regulated at the state and local level, and requirements for licensing, permits, mandatory inspections, adopted code editions, utility coordination, and consumer disclosures differ by jurisdiction and cannot be waived by agreement. Never perform or accept electrical work that bypasses a required permit or inspection. Review and adapt this document for the jurisdiction where the property sits, and consult a licensed attorney or your local building department before relying on it. Use of this template does not create an attorney-client relationship with ScanContract.
Key Clauses Explained
What each important clause does — and what to watch out for before you sign.
Licensed Work and Code Compliance
Confirms the work is performed under an electrical license and meets the adopted electrical code.
Homeowners should verify the license and confirm a permit is being pulled, because unpermitted electrical work is the item most likely to be flagged at resale and most likely to complicate an insurance claim after a fire. Electricians should state up front that inspectors routinely require corrections in the work area, so those items read as code compliance rather than as upselling.
Load Calculation and Service Capacity
Verifies the service and panel can carry the added load before equipment is ordered.
Homeowners adding an EV charger, a hot tub, or electric heat should get the calculation before buying the equipment, since a service upgrade can cost more than the appliance. Electricians should document the loads the owner disclosed, because an undisclosed future addition is the usual reason a calculation turns out wrong.
Permits and Rough Inspection
Requires inspection of the rough wiring before it is concealed and a final before service is restored.
Never let anyone close a wall over uninspected wiring, no matter how tight the schedule is. Homeowners should ask for the permit number and the inspection sign-off at completion. Electricians should hold the line on this, since re-opening finished walls for a missed inspection is entirely at their cost.
Power Interruption and Consequential Loss
Sets notice for planned outages and excludes losses caused by being without power.
Homeowners with medical equipment, a sump pump, a home office, or a freezer full of food should plan for the outage window rather than assume a few minutes. Ask who coordinates the utility disconnect and what happens if the utility is late. Electricians should exclude spoilage, lost data, and business interruption explicitly, since those claims dwarf the job value.
Concealed Wiring Conditions
Handles knob-and-tube, aluminum branch wiring, ungrounded circuits, and other findings in older homes.
Homeowners in pre-1970s houses should treat this as likely rather than hypothetical, and should ask what the correction typically costs before work starts. Electricians should notify in writing and price a change order rather than absorbing corrections, and should note that aged terminations sometimes fail when circuits are cycled.
Emergency and Troubleshooting Rates
Documents diagnostic charges, minimums, and the premium for after-hours calls.
Homeowners should ask whether troubleshooting is billed separately from the repair and whether the diagnostic time is credited. Electricians should cap the diagnostic block and require written approval before continuing, because open-ended troubleshooting invoices are the most commonly disputed line item in the trade.
Restoration of Walls and Trenches
Defines how far the electrician goes in repairing openings and excavation.
Assume drywall finishing, paint, insulation, concrete, and landscaping are excluded unless the contract lists them. Homeowners should line up a drywall or concrete trade in advance rather than discovering the gap at the end. Electricians should state the restoration level in plain terms, since "we will patch it" means very different things to the two parties.
Warranty on Labor Versus Devices
Separates the workmanship warranty from manufacturer coverage on panels, breakers, and fixtures.
Homeowners should collect the manufacturer documentation and confirm how long the labor coverage runs, since a warranted breaker still costs a service call to replace after year one. Electricians should exclude surges, lightning, utility events, rodents, and owner-supplied fixtures by name, because those are the failures most often blamed on installation.
Frequently Asked Questions
Do I need a permit for electrical work in my home?▾
Why does the electrician say I need a service upgrade for one new circuit?▾
How long will my power be off for a panel replacement?▾
What happens if the inspector finds problems that were not in the scope?▾
Can an electrical contractor file a lien if the bill is not paid?▾
Related Templates
Plumbing Contract
A free plumbing contract template for repairs, repipes, fixture installs, and drain work: licensed scope, permits and inspections, diagnostic and emergency rates, water shutoff, concealed conditions, and a labor and parts warranty. Download in PDF or Word.
Free download — PDF & Word →HVAC Service Contract
A free HVAC service contract template covering maintenance plan tiers, seasonal tune-up checklists, refrigerant handling and pricing, priority service and discounts, repair authorization limits, and equipment warranty conditions. Download in PDF or Word.
Free download — PDF & Word →Subcontractor Agreement
A free subcontractor agreement template for general contractors hiring a trade: scope and flow-down obligations, payment and lien waivers, insurance and additional insured status, backcharges, safety, and indemnity. Download in PDF or Word.
Free download — PDF & Word →Handyman Services Agreement
A free handyman services agreement template covering the punch list of tasks, hourly versus flat-rate pricing, the limits of unlicensed work, materials and pickup time, property access, and a short workmanship warranty. Download in PDF or Word.
Free download — PDF & Word →Downloaded a template? Analyze the final contract.
Before you sign, let ScanContract's AI check for risky clauses and missing protections.
Scan My Contract